Our work with Wellington City Council helps look after existing public assets so they remain safe, useful, and fit for purpose. We provide practical architectural advice for theatres, community facilities, and occupied public buildings. A project often starts with a specific issue such as leaks, access, or building condition. From there, we define a clear scope, plan the next steps, and support delivery through consent, procurement, and construction.

Client
Wellington City Council
Services
Community architecture
/
/

St James Theatre

At the St James Theatre, our work with Wellington City Council began as a roofing repair and developed into a broader remediation project. The building remained in public use, so the work needed to be carefully planned around performances, access, safety, weather risk, and day-to-day theatre operations. Our architectural role included reviewing the existing building fabric, documenting repairs, resolving details for parapets, gutters, rainwater systems, access, and plant platforms, and working with the contractor as hidden conditions were uncovered on site. We also administered the works under NZIA SCC1, keeping instructions, variations, progress claims, milestones, completion items, and defects close-out clearly recorded.

St James TheatreSt James Theatre
This is some text inside of a div block.

Left

Te Whaea

At Te Whaea, our work with Wellington City Council began with roof leaks and guttering issues, then developed into a wider repair project once the building fabric, drainage, access, tenant operations, and consent requirements were understood. Our role was to guide the project from early investigation through to repair, consent, procurement, construction, and close-out. We reviewed existing information and site conditions, brought in specialist advice, tested practical repair options, documented the warm roof replacement, and coordinated WCC, NZ Dance, consultants, contractors, and building users throughout the process.

Te WhaeaTe Whaea
This is some text inside of a div block.

Right

WCC community centre

We worked with Wellington City Council to turn an unused central-city storefront near Te Aro Park into a practical community facility. The project started with a clear question: how could an empty tenancy become a useful public space for the local community? Our work helped move the idea into a buildable project by testing the site, understanding Council's objectives, and shaping the brief with community input. The tenancy was a long, narrow former shop with frontage to Manners Street and Opera House Lane. We reviewed the site early so key issues were understood before the design was finalised. This included services, access, safety, glazing, landlord requirements, and change-of-use matters. Workshops and 3D modelling helped Council staff and community representatives see the options clearly and make timely decisions. Our role brought together project management, community engagement, design coordination, consent, procurement, and contract documentation. We kept the scope and technical advice connected throughout the process so WCC could deliver a welcoming public facility from an empty storefront.

WCC community centreWCC community centre